Loading…

Godrej Koerber

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
Case Study

05 November 2022

Pidilite Industries

Pidilite Industries Limited has been a pioneer and leader in consumer and specialities chemicals in India. They planned a greenfield plant in the southern region of the country.

This plant is envisaged as the most modern plant in Pidilite with the cognizance of Manufacturing 4.0, End Of Line Automation, and Automated Intralogistics Solutions.

It is an integrated facility with a production block and warehouse storage along with the material movement from warehouse to ground/multiple floors.

Case Study for Waewhouse Management System Client Pidilite - Godrej Koerber
Challenges:
  • Optimise storage capacity in the given footprint
  • Enable effective utilisation of manpower
  • Handle higher throughputs to meet growing business needs
  • Improve operational efficiency with smooth and hassle-free operations
Solutions Implemented:
Play Video
Benefits:
  • Optimum utilisation of available warehouse footprint along with high-density storage
  • Integration of ASRS with palletizer and a connection to feed RM/PM at multiple levels
  • Storage in 1/10th of the total area
  • Guaranteed throughput which meets the current and future business requirements
  • The system is designed and installed to meet their next 5 years’ requirements
  • Customer could cater to South and East region’s peak season requirements of Finished Goods